On 11 September 2012 Tokyo Electric Power Company (TEPCO) released 600 photos
taken March 11-28, 2011 after the tsunami hit the Fukushima Dai-ichi
Nuclear Power Station. These are the TEPCO links to 40 collections within
the 600.
| List
and Thumbnails of the 600 Photos (1.1MB) |
| TEPCO listed links in reverse chronoligical order |
| (40)
Around the Unit 4 Reactor Building March 28, 2011 |
| (39)
Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside) March
28, 2011 |
| (38)
Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside) March
28, 2011 |
| (37)
Unit 2 Transformer Area March 28, 2011 |
| (36)
Unit 1 Transformer Area March 28, 2011 |
| (35)
Unit 4 Instrument Air Compressor March 25, 2011 |
| (34)
Around the Unit 1 Large Equipment Hatch March 23, 2011 |
| (33)
Inside the Unit 2 Power Source Room March 23, 2011 |
| (32)
Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside) March 23,
2011 |
| (31)
Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside) March
23, 2011 |
| (30)
Sea side area of Unit 2 March 23, 2011 |
| (29)
Sea side area of Unit 1 March 23, 2011 |
| (28)
At Fukushima Daiichi Nuclear Power Station March 23, 2011 |
| (27)
Inside the Unit 2 Basement Power Source Room March 23, 2011 |
| (26)
Inside the Unit 2 Alternate Power Source Room March 23, 2011 |
| (25)
Around the Unit 2 Alternate Power Source Room March 23, 2011 |
| (24)
Inside the Unit 1 Power Source Room March 23, 2011 |
| (23)
Around the Outdoor Power Panel March 22, 2011 |
| (22)
Cable Route from the Reserve Power Substation to Unit 2 Turbine Building
Power Panel March 22, 2011 |
| (21)
Inside Reserve Power Substation March 22, 2011 |
| (20)
Around Reserve Power Substation March 22, 2011 |
| (19)
Unit 6 Transformer Area March 22, 2011 |
| (18)
Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside) March 22,
2011 |
| (17)
Unit 5 Transformer Area March 22, 2011 |
| (16)
Unit 5 and 6 Switchyard Area (Outside) March 22, 2011 |
| (15)
The Situation at Fukushima Daiichi Nuclear Power Station after the explosion
of Unit 1,3 and 4. March 17, 2011 |
| (14)
Inside the Unit 5 Power Source Room March 17, 2011 |
| (13)
Inside the Unit 5 and 6 Vertical Shafts March 17, 2011 |
| (12)
Inside the Unit 6 Power Source Room March 17, 2011 |
| (11)
Inside the Unit 5 and 6 Transmission Board Room March 17, 2011 |
| (10)
Inside the Unit 5 and 6 Main Control Room March 17, 2011 |
| (9)
Sea side area of Unit 5 and 6 March 17, 2011 |
| (8)
Appearance of Unit 3 after the explosion, and appearance of Unit 4 before
the explosion viewed from Unit 3 March 11, 2011 |
| (7)
Appearance of Unit 1 after the explosion March 11, 2011 |
| (6)
The situation at Fukushima Daiichi Nuclear Power Station in the aftermath
of the Tohoku-Chihou-Taiheiyo-Oki Earthquake March 11, 2011 |
| (5)
The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit
March 11, 2011 |
| (4)
The situation at Fukushima Daiichi Nuclear Power Station after the
Tohoku-Chihou-Taiheiyo-Oki Earthquake March 11, 2011 |
| (3)
The situation at Fukushima Daiichi Nuclear Power Station (Main Office Building,
etc.) after the Tohoku-Chihou-Taiheiyo-Oki Earthquake March 11, 2011 |
| (2)
The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit
(Undertow) March 11, 2011 |
| (1)
The shallow draft quay in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki
Earthquake March 11, 2011 |
|