Donate $25 for two DVDs of the Cryptome collection of files from June 1996 to the present

Natsios Young Architects


17 July 2009. Add nine projects.
16 July 2009. Add six projects.

15 July 2009


[Federal Register: July 15, 2009 (Volume 74, Number 134)]
[Notices]               
[Page 34320]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15jy09-67]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13473-000]

 
FFP Project 60, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

July 8, 2009.
    On May 22, 2009, FFP Project 60, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Springfield Bend Hydrokinetic 
Project, to be located on the Mississippi River, in West Baton Rouge 
Parish, Louisiana and East Baton Rouge Parish, Louisiana.
    The sole purpose of a preliminary permit, if issued, is to grant 
the permit holder priority to file a license application during the 
permit term. A preliminary permit does not authorize the permit holder 
to perform any land disturbing activities or otherwise enter upon lands 
or waters owned by others without the owners' express permission.
    The proposed Springfield Bend Hydrokinetic Project consists of: (1) 
2,090 proposed 40 kilowatt Free Flow generating units having a total 
installed capacity of 83.6 megawatts; (2) a 2.3-mile-long, 69 kilovolt 
transmission line; and (3) appurtenant facilities. The proposed 
Springfield Bend Hydrokinetic Project would have an average annual 
generation of 366 gigawatt-hours.
    Applicant Contact: Ramya Swaminathan, Vice President of 
Development, Free Flow Power Corporation, 33 Commercial Street, 
Gloucester, MA 01930; phone: (978) 226-1531.
    FERC Contact: Kim Carter, 202-502-6486.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings, please go to 
the Commission's Web site located at http://www.ferc.gov/filing-
comments.asp. More information about this project, including a copy of 
the application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13473) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-16720 Filed 7-14-09; 8:45 am]

BILLING CODE 6717-01-P


[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34322] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-71] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13479-000] FFP Project 63, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 63, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Fort Adams Hydrokinetic Project, to be located on the Mississippi River, in Concordia Parish, Louisiana and Wilkinson County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Fort Adams Hydrokinetic Project consists of: (1) 2,693 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 107.72 megawatts; (2) a 3.3-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Fort Adams Hydrokinetic Project would have an average annual generation of 472 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13479) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16725 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34320-34321] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-68] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13475-000] FFP Project 64, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 64, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Palmetto Point Hydrokinetic Project, to be located on the Mississippi River, in Concordia Parish, Louisiana and Wilkinson County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Palmetto Point Hydrokinetic Project consists of: (1) 5,069 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 202.76 megawatts; (2) a 7-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Palmetto Point Hydrokinetic [[Page 34321]] Project would have an average annual generation of 888 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, (202) 502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13475) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16721 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34323] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-73] [[Page 34323]] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13476-000] FFP Project 65, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 65, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Jackson Point Hydrokinetic Project, to be located on the Mississippi River, in Concordia Parish, Louisiana and Adams County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Jackson Point Hydrokinetic Project consists of: (1) 4,435 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 177.40 megawatts; (2) a 6-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Jackson Point Hydrokinetic Project would have an average annual generation of 777 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13476) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16722 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34323] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-74] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13477-000] FFP Project 67, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 67, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Bondurant Chute Hydrokinetic Project, to be located on the Mississippi River, in Tensas Parish, Louisiana and Claiborne County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Bondurant Chute Hydrokinetic Project consists of: (1) 3,802 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 152.08 megawatts; (2) a 5-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Bondurant Chute Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp.. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13477) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16723 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34322] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-72] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13478-000] FFP Project 68, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 68, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Davis Island Bend Hydrokinetic Project, to be located on the Mississippi River, in Tensas Parish, Louisiana and Warren County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Davis Island Bend Hydrokinetic Project consists of: (1) 3,675 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 147 megawatts; (2) a 4.8-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Davis Island Bend Hydrokinetic Project would have an average annual generation of 644 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, (202) 502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13478) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16724 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34321-34322] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-70] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13480-000] FFP Project 69, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 69, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Breeze Point Hydrokinetic Project, to be located on the Mississippi River, in Concordia Parish, Louisiana and Wilkinson County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Breeze Point Hydrokinetic Project consists of: (1) 4,942 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 197.68 megawatts; (2) a 6.8-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Breeze Point Hydrokinetic Project would have an average annual generation of 866 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the [[Page 34322]] Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13480) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16726 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 15, 2009 (Volume 74, Number 134)] [Notices] [Page 34321] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15jy09-69] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13481-000] FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 70, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Filter Bend Hydrokinetic Project, to be located on the Mississippi River, in East Carroll Parish, Louisiana and Issaquena County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners'' express permission. The proposed Filter Bend Hydrokinetic Project consists of: (1) 3,802 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 152.08 megawatts; (2) a 5-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Filter Bend Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's website under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13481) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16727 Filed 7-14-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 16, 2009 (Volume 74, Number 135)] [Notices] [Page 34562-34563] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16jy09-33] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13482-000] FFP Project 71, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 71, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Matthews Bend Hydrokinetic Project, to be located on the Mississippi River, in Chicot County, Arkansas and Washington County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Matthews Bend Hydrokinetic Project consists of: (1) 3,802 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 152.08 megawatts; (2) a 5-mile-long, 69 kilovolt transmission line; [[Page 34563]] and (3) appurtenant facilities. The proposed Matthews Bend Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13482) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16847 Filed 7-15-09; 8:45 am] BILLING CODE 6717-01-P
Federal Register: July 16, 2009 (Volume 74, Number 135)] [Notices] [Page 34565] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16jy09-39] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13483-000] FFP Project 72, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 72, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Miller Bend Hydrokinetic Project, to be located on the Mississippi River, in Chicot County, Arkansas and Washington County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Miller Bend Hydrokinetic Project consists of: (1) 2,724 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 108.96 megawatts; (2) a 3.3-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Miller Bend Hydrokinetic Project would have an average annual generation of 477 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13483) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16848 Filed 7-15-09; 8:45 am]
[Federal Register: July 16, 2009 (Volume 74, Number 135)] [Notices] [Page 34563] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16jy09-34] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13484-000] FFP Project 73, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 73, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Georgetown Bend Hydrokinetic Project, to be located on the Mississippi River, in Desha and Chicot Counties, Arkansas and Bolivar and Washington Counties, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Georgetown Bend Hydrokinetic Project consists of: (1) 2,915 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 116.60 megawatts; (2) a 3.6-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Georgetown Bend Hydrokinetic Project would have an average annual generation of 511 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13484) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16849 Filed 7-15-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 16, 2009 (Volume 74, Number 135)] [Notices] [Page 34565] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16jy09-38] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13485-000] FFP Project 75, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 75, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Old Town Bend Hydrokinetic Project, to be located on the Mississippi River, in Phillips County, Arkansas and Coahoma County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Old Town Bend Hydrokinetic Project consists of: (1) 3,358 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 134.32 megawatts; (2) a 4.3-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Old Town Bend Hydrokinetic Project would have an average annual generation of 588 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's website under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http:[sol][sol]www.ferc.gov/ filing-comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http:[sol][sol]www.ferc.gov/docs- filing/elibrary.asp. Enter the docket number (P-13485) in the docket number field to access the document. For assistance, call toll-free 1- 866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16850 Filed 7-15-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 16, 2009 (Volume 74, Number 135)] [Notices] [Page 34563-34564] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16jy09-35] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13486-000] FFP Project 76, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 76, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Burke Landing Hydrokinetic Project, to be located on the Mississippi River, in Phillips County, Arkansas and Coahoma County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Burke Landing Hydrokinetic Project consists of: (1) 2,028 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 81.12 megawatts; (2) a 2.2-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Burke Landing Hydrokinetic Project would have an average annual generation of 355 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the [[Page 34564]] Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13486) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16851 Filed 7-15-09; 8:45 am] BILLING CODE 6717-01-P
[Federal Register: July 16, 2009 (Volume 74, Number 135)] [Notices] [Page 34564-34565] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr16jy09-37] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13487-000] FFP Project 77, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 77, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Cow Island Bend Hydrokinetic Project, to be located on the Mississippi River, in Crittenden County, Arkansas; DeSoto County, Mississippi; and Shelby County, Tennessee. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Cow Island Bend Hydrokinetic Project consists of: (1) 3,802 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 152.08 megawatts; (2) a 5-mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Cow Island Bend Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226-1531. FERC Contact: Kim Carter, 202-502-6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, [[Page 34565]] notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P- 13487) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Kimberly D. Bose, Secretary. [FR Doc. E9-16852 Filed 7-15-09; 8:45 am] BILLING CODE 6717-01-P
17 July 2009. Add 9 projects. Links go to Federal Register
FFP Project 66, LLC ,
34748 [E9–16989] [TEXT]
FFP Project 78, LLC ,
34751 [E9–16981] [TEXT]
FFP Project 79, LLC ,
34747 [E9–16982] [TEXT]
FFP Project 80, LLC ,
34751–34752 [E9–16983] [TEXT]
FFP Project 81, LLC ,
34747 [E9–16984] [TEXT]
FFP Project 82, LLC ,
34749–34750 [E9–16985] [TEXT]
FFP Project 83, LLC ,
34749 [E9–16986] [TEXT]
FFP Project 84, LLC ,
34748–34749 [E9–16987] [TEXT]
FFP Project 85, LLC ,
34748 [E9–16988] [TEXT]