![]()
|
||
3 March 2010
[Federal Register: March 1, 2010 (Volume 75, Number 39)][Notices] [Page 9196-9197] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr01mr10-58] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Letter From Secretary of Energy Accepting Defense Nuclear Facilities Safety Board (Board) Recommendation 2009-2 AGENCY: Department of Energy. ACTION: Notice. ----------------------------------------------------------------------- SUMMARY: The Department of Energy (DOE) is making available the February 2, 2010, Secretary's letter to the Board accepting the Board's recommendation 2009-2 regarding seismic safety at the Los Alamos National Laboratory Plutonium Facility. ADDRESSES: U.S. Department of Energy, HS-1.1, 1000 Independence Ave, SW., Washington, DC 20585. SUPPLEMENTARY INFORMATION: DOE is making this letter available for public information and solicits comments from the public. Comments may be sent to the address above. The text of the document is below. It may also be viewed at: http://www.hss.energy.gov/deprep/default.asp. Issued in Washington, DC, on February 23, 2010. Mark B. Whitaker, Departmental Representative to the Defense Nuclear Facilities Safety Board. February 2, 2010. The Honorable John E. Mansfield, Vice Chairman, Defense Nuclear Facilities Safety Board, 625 Indiana Avenue, NW., Suite 700, Washington, DC 20004. Dear Mr. Vice Chairman: The Department of Energy (DOE) acknowledges receipt of Defense Nuclear Facilities Safety Board (Board) Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety, issued on October 26, 2009, and I accept the recommendation. In December 2008, the National Nuclear Security Administration (NNSA) Los Alamos Site Office (LASO) approved a new Documented Safety Analysis (DSA) for the Plutonium Facility at Los Alamos National Laboratory (LANL), the first major upgrade to the Plutonium Facility's Safety Basis since 1996. The DSA conservatively describes potentially high mitigated consequences to the maximally exposed off-site individual (i.e., the public) from a first-floor fire following a seismic event, approximately two orders of magnitude higher than our evaluation guideline for selecting safety class controls. Approval of the DSA included recognition of weaknesses in the facility's control set and the need to upgrade a number of safety systems in order to meet DOE nuclear safety policies. As a result, Los Alamos National Security (LANS) has initiated a number of improvements to address safety issues identified in the DSA, including transitioning to an active confinement ventilation strategy. LANS recently submitted to LASO an update of the facility's DSA that includes revised seismic accident scenarios to more accurately, but conservatively, evaluate the consequences of such scenarios. The DSA annual update, to be reviewed and approved by LASO, includes about a factor of 15 reduction from the previous DSA of the mitigated consequences to the maximally exposed off-site individual from a post- seismic fire. This proposed reduction is accomplished by establishing stricter limits to the overall material at risk allowed in the facility and by defining specific material quantity limits for various forms of material such as liquid, metal, and oxide and for heat-source plutonium. However, additional upgrades will be needed in order to meet DOE nuclear safety policies. A significant number of actions have been completed recently or are planned in the near future that improve the safety posture of the facility. For example, in the near term, NNSA will incentivize LANS to accomplish the following in FY 10:
|