-
green form forty expanded, revised, revised, a correction list used to handle resistive cases (TA in normal range but not responding well to auditing). Assess M3 with all reading items taken to F/N per instructions, then handled in depth with L&N and R3R processes. Normally done only once if done properly. EP is all reading items handled, pc no longer resistive and making good progress in auditing. Note that a pc can be made to appear resistive by poor basic auditing and failure to use the right correction list when needed. (BTB 11 Aug 72R)
- this correction list was further revised in December 1974 and renumbered as Expanded GF40RB (HCOB 30 Jun 71R)